Production
An operational checklist before you lock an Oman event
2026-07-01
Use this as a conversation, not a talisman. If a line is blank a week out, that is the risk.
Room and power
Recce notes, hanging points, dock times, generator need, house AV truthfulness.
Outdoor: wind, dew, heat, shade, neighbour noise.
People and language
Bilingual materials proofed. Host language mix. Interpretation tested. Protocol names locked.
Crew housing if not Muscat. Overnight labour named.
Show and after
Cue sheet owners. Rehearsal block. Content backups. Teardown and crate list.
Photography consent. Data from registration handled to policy.